.1 Cabinet approved the following schemes to be added to the capital programme for 2009-10
Scheme Reference, Description & Directorate
|
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
2009-10/GF060 Places of Change
Housing GF |
The overall Places of Change scheme is to provide a new flagship facility for homeless people in the borough. This project is being completed in partnership with Midland Heart Housing Association. NBC’s responsibility is to provide project management support and ensure vacant possession of the Maple Buildings site. |
873,155 |
696,816 |
£1.42m CLG Grant, £149,971 Section 106 |
2009-10 GF063B CMP Lighting Upgrade
Environment & Culture |
Carbon management project to update the lighting at St John’s multi storey car park and Lings Forum Leisure Centre. This project does not require any additional funding as the external funding and match funding was approved in 2008-09. |
48,334 |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 GF064 Playbuilder – Kingsthorpe Recreation Ground
Assistant Chief Executive |
To provide a new adventure play area, aimed at 8-13 year olds, on Kingsthorpe Recreation Ground. |
49,000 |
- |
DCFS Grant |
2009-10 GF066B CMP Boiler Room Pipework, Valve & Flange Insulation
Environment & Culture |
Carbon management project to insulate pipework at Mounts Baths, Danes Camp Leisure Centre and the Guildhall. This project does not require any additional funding as the external funding and match funding was approved in 2008-09. |
17,479 |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 HRA016 Woodside Way (NBC Council Dwelling New Build Scheme)
Housing HRA |
The construction of 8 family homes on a garage site within the Kings Heath area of Northampton. The demolition of existing garages will be required to enable the construction of the new homes. 62% of this project will be funded by NBC resources and 38% will be bid for from the Challenge Fund Pot, Homes & Community Agency (HCA)
|
225,957 |
958,036 |
£600,080 Prudential Borrowing, £132,000 Section 106, £451,913 HCA Grant |
2009-10 HRA017 Fire Safety Works to Communal Areas
Housing HRA |
The Council is required to complete fire assessments to the communal areas of its flats and maisonettes. A number of improvements are expected to meet its duty under the Regulatory Reform Act & Orders. Improvements could include replacement of fire doors, emergency lighting, smoke alarms, fire stops and other significant works. This will be funded by a reduction in the decent homes budget. |
100,000 |
- |
Major Repairs Reserve |
Further details of these appraisals can be seen at Annex A to this report.
2.2 That Cabinet approve the following variations to schemes in the capital programme for 2009-10.
Scheme Reference, Description & Directorate |
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
Carbon Management Programme |
||||
2008-09 GF036B V03 CMP PowerPerfector Voltage Optimisation
Environment & Culture |
This project formed part of the carbon management programme that was approved in 2008-09. Due to high frequency lighting being used in the locations identified, the original savings cannot be achieved. The external funding and ring-fenced match funding will have to be used on other carbon management projects to meet the terms and conditions of the funding. |
(124,886)
|
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF036B V04 CMP St John’s Lighting
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(2,555) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF036B V05 CMP Loft & Cavity Wall Insulation
Environment & Culture |
Loft insulation at Weston Favell offices was included as part of this project, however as these offices are now closed this will not be going ahead. The money released from this project will have to be re-directed to other carbon management projects to ensure the terms and conditions of the external funding are met. |
(1,386) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V02 CMP Steam Control Valve
Environment & Culture |
The cost of this work was more than originally estimated. The overspend will be covered by underspends on other carbon management projects, therefore there is no additional financing requirement. |
3,595 |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V03 CMP Variable Speed Drive
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(401) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V04 CMP Building Energy Management System
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(644) |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 GF007B V01 Carbon Management Programme
Environment & Culture |
The following carbon management projects are to be removed from the 2009-10 capital programme as the revenue savings are not achievable: Voltage Optimisation at St Johns’s MSCP (£11,757), Vending Machine Timer Controls (£1,653), Air Conditioning Unit Controls at Westbridge (£5,512), Hot Water Storage Time Switches (£8,765), Lighting Upgrade – Guildhall & Westbridge (£31,751), Guildhall Spot Lights (£827), PIR Lighting Controls at Guildhall Car Park (£4,134). These projects were to be funded by a revenue contribution from the savings on the Salix funded projects. To meet the terms and conditions of the funding the savings have to be re-invested in other carbon management projects, therefore the revenue contribution will be ring-fenced for future projects. |
(64,399) |
- |
Revenue Financing (GF) |
Housing Revenue Account |
||||
2009-10 HRA004 V02 Decent Homes & Poor Condition
Housing HRA |
Phase 2 of decent homes will not be on site this financial year, however work can be completed on the complete roofs project which will contribute towards decent home spend. £600k is to be removed from this project to the complete roofs project. Also, £100k is required to fund the Fire Safety Works to Communal Areas project. |
(700,000) |
- |
Major Repairs Reserve |
2008-09 HRA007 V02 Complete Roofs
Housing HRA |
The main decent homes phase 2 will not be started this financial year. However, roofs have been identified which can be completed in advance of the second stage and contribute towards the decent homes spend this financial year. An increase in budget of £600k is required for this work, to be funded by a reduction to the decent homes and poor condition budget.
|
600,000 |
- |
Major Repairs Reserve |
Private Sector Housing – GOEM funded schemes |
||||
2006-07 Slippage V16 GOEM Roofing & Electrics
Housing GF |
There are currently three different capital codes for decent homes works funded by GOEM. It is proposed to move all of the budget and expenditure to one capital code as often the properties require more than one type of work, which makes reconciliation between the private sector housing and finance system difficult. Also, there is no requirement by GOEM to split the grants by type of work.
|
(113,176) |
- |
GOEM |
2007-08 PR005B V02 GOEM Solid Wall Insulation
Housing GF |
There are currently three different capital codes for decent homes works funded by GOEM. It is proposed to move all of the budget and expenditure to one capital code as often the properties require more than one type of work, which makes reconciliation between the private sector housing and finance system difficult. Also, there is no requirement by GOEM to split the grants by type of work.
|
(200,732) |
- |
GOEM |
2009-10 GF026 V01 GOEM Projects – Decent Homes
Housing GF |
It is proposed to move the budget from the above two projects to this project. This code is currently used for general decent homes works and having the budget all on one cost centre would make the coding and reconciliation of the grants simpler.
|
313,908 |
- |
GOEM |
Movement between years |
||||
2009-10 GF065 V01 Improvement Works at Grosvenor Centre Car Park
Planning & Regeneration |
Commissioning will take place in 2009-10 with the beginning of the works in late winter/early spring, therefore the bulk of the spend will be in early 2010-11. |
(1,700,000) |
1,700,000 |
Prudential Borrowing |
Further details of these variations can be seen at Annex B of this report.
2.3 That Cabinet noted:
a) The following scheme, which was approved by Cabinet on the 5 August 2009 as part of a separate report:
Scheme Reference, Description & Directorate
|
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
2009-10 GF065 Improvement Works at Grosvenor Centre Car Park
Finance & Assets |
Major improvement works at the car park to assist the final negotiations of the proposed Conditional Development Agreement relating to the Grosvenor Greyfriars complex. |
1,750,000 |
- |
Prudential Borrowing |
Further details of this appraisal can be seen at Annex A to this report.
b) The capital programme monitoring position as at end of June 2009, including forecast outturns and slippage into 2010-11, as set out at Annex C and D.
c) The funding arrangements for the 2009-10 capital programme as set out at Annex E.
2.4 Cabinet approved the usage of section 106 funds as outlined in paragraph 2.1 additions to the capital programme.
· GF060 Places of Change
· HRA016 Woodside Way
Minutes:
Councillor Perkins submitted a report that set out the situation in respect of the Council’s Capital Programme for 2009/10 and noted that the programme was fully funded. He also commented that many of the schemes related to carbon management and the Council’s intention to reduce its carbon footprint.
RESOLVED: (1):
Scheme Reference, Description & Directorate
|
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
2009-10/GF060 Places of Change
Housing GF |
The overall Places of Change scheme is to provide a new flagship facility for homeless people in the borough. This project is being completed in partnership with Midland Heart Housing Association. NBC’s responsibility is to provide project management support and ensure vacant possession of the Maple Buildings site. |
873,155 |
696,816 |
£1.42m CLG Grant, £149,971 Section 106 |
2009-10 GF063B CMP Lighting Upgrade
Environment & Culture |
Carbon management project to update the lighting at St John’s multi storey car park and Lings Forum Leisure Centre. This project does not require any additional funding as the external funding and match funding was approved in 2008-09. |
48,334 |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 GF064 Playbuilder – Kingsthorpe Recreation Ground
Assistant Chief Executive |
To provide a new adventure play area, aimed at 8-13 year olds, on Kingsthorpe Recreation Ground. |
49,000 |
- |
DCFS Grant |
2009-10 GF066B CMP Boiler Room Pipework, Valve & Flange Insulation
Environment & Culture |
Carbon management project to insulate pipework at Mounts Baths, Danes Camp Leisure Centre and the Guildhall. This project does not require any additional funding as the external funding and match funding was approved in 2008-09. |
17,479 |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 HRA016 Woodside Way (NBC Council Dwelling New Build Scheme)
Housing HRA |
The construction of 8 family homes on a garage site within the Kings Heath area of Northampton. The demolition of existing garages will be required to enable the construction of the new homes. 62% of this project will be funded by NBC resources and 38% will be bid for from the Challenge Fund Pot, Homes & Community Agency (HCA)
|
225,957 |
958,036 |
£600,080 Prudential Borrowing, £132,000 Section 106, £451,913 HCA Grant |
2009-10 HRA017 Fire Safety Works to Communal Areas
Housing HRA |
The Council is required to complete fire assessments to the communal areas of its flats and maisonettes. A number of improvements are expected to meet its duty under the Regulatory Reform Act & Orders. Improvements could include replacement of fire doors, emergency lighting, smoke alarms, fire stops and other significant works. This will be funded by a reduction in the decent homes budget. |
100,000 |
- |
Major Repairs Reserve |
(2) That the following variations to schemes in the Capital Programme for 2009-10 be approved.
Scheme Reference, Description & Directorate |
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
Carbon Management Programme |
||||
2008-09 GF036B V03 CMP PowerPerfector Voltage Optimisation
Environment & Culture |
This project formed part of the carbon management programme that was approved in 2008-09. Due to high frequency lighting being used in the locations identified, the original savings cannot be achieved. The external funding and ring-fenced match funding will have to be used on other carbon management projects to meet the terms and conditions of the funding. |
(124,886)
|
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF036B V04 CMP St John’s Lighting
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(2,555) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF036B V05 CMP Loft & Cavity Wall Insulation
Environment & Culture |
Loft insulation at Weston Favell offices was included as part of this project, however as these offices are now closed this will not be going ahead. The money released from this project will have to be re-directed to other carbon management projects to ensure the terms and conditions of the external funding are met. |
(1,386) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V02 CMP Steam Control Valve
Environment & Culture |
The cost of this work was more than originally estimated. The overspend will be covered by underspends on other carbon management projects, therefore there is no additional financing requirement. |
3,595 |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V03 CMP Variable Speed Drive
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(401) |
- |
50% Salix, 50% Prudential Borrowing |
2008-09 GF045B V04 CMP Building Energy Management System
Environment & Culture |
The final cost of this project was less than originally estimated. The underspend will have to be used on other carbon management projects to ensure the terms and conditions of the external funding are met. |
(644) |
- |
50% Salix, 50% Prudential Borrowing |
2009-10 GF007B V01 Carbon Management Programme
Environment & Culture |
The following carbon management projects are to be removed from the 2009-10 capital programme as the revenue savings are not achievable: Voltage Optimisation at St Johns’s MSCP (£11,757), Vending Machine Timer Controls (£1,653), Air Conditioning Unit Controls at Westbridge (£5,512), Hot Water Storage Time Switches (£8,765), Lighting Upgrade – Guildhall & Westbridge (£31,751), Guildhall Spot Lights (£827), PIR Lighting Controls at Guildhall Car Park (£4,134). These projects were to be funded by a revenue contribution from the savings on the Salix funded projects. To meet the terms and conditions of the funding the savings have to be re-invested in other carbon management projects, therefore the revenue contribution will be ring-fenced for future projects. |
(64,399) |
- |
Revenue Financing (GF) |
Housing Revenue Account |
||||
2009-10 HRA004 V02 Decent Homes & Poor Condition
Housing HRA |
Phase 2 of decent homes will not be on site this financial year, however work can be completed on the complete roofs project which will contribute towards decent home spend. £600k is to be removed from this project to the complete roofs project. Also, £100k is required to fund the Fire Safety Works to Communal Areas project. |
(700,000) |
- |
Major Repairs Reserve |
2008-09 HRA007 V02 Complete Roofs
Housing HRA |
The main decent homes phase 2 will not be started this financial year. However, roofs have been identified which can be completed in advance of the second stage and contribute towards the decent homes spend this financial year. An increase in budget of £600k is required for this work, to be funded by a reduction to the decent homes and poor condition budget.
|
600,000 |
- |
Major Repairs Reserve |
Private Sector Housing – GOEM funded schemes |
||||
2006-07 Slippage V16 GOEM Roofing & Electrics
Housing GF |
There are currently three different capital codes for decent homes works funded by GOEM. It is proposed to move all of the budget and expenditure to one capital code as often the properties require more than one type of work, which makes reconciliation between the private sector housing and finance system difficult. Also, there is no requirement by GOEM to split the grants by type of work.
|
(113,176) |
- |
GOEM |
2007-08 PR005B V02 GOEM Solid Wall Insulation
Housing GF |
There are currently three different capital codes for decent homes works funded by GOEM. It is proposed to move all of the budget and expenditure to one capital code as often the properties require more than one type of work, which makes reconciliation between the private sector housing and finance system difficult. Also, there is no requirement by GOEM to split the grants by type of work.
|
(200,732) |
- |
GOEM |
2009-10 GF026 V01 GOEM Projects – Decent Homes
Housing GF |
It is proposed to move the budget from the above two projects to this project. This code is currently used for general decent homes works and having the budget all on one cost centre would make the coding and reconciliation of the grants simpler.
|
313,908 |
- |
GOEM |
Movement between years |
||||
2009-10 GF065 V01 Improvement Works at Grosvenor Centre Car Park
Planning & Regeneration |
Commissioning will take place in 2009-10 with the beginning of the works in late winter/early spring, therefore the bulk of the spend will be in early 2010-11. |
(1,700,000) |
1,700,000 |
Prudential Borrowing |
(3) That the following be noted:
a) The scheme below which was approved by Cabinet on the 5 August 2009 as part of a separate report:
Scheme Reference, Description & Directorate
|
Narrative |
2009-10 £ |
Future Years £ |
Funding Source |
2009-10 GF065 Improvement Works at Grosvenor Centre Car Park
Finance & Assets |
Major improvement works at the car park to assist the final negotiations of the proposed Conditional Development Agreement relating to the Grosvenor Greyfriars complex. |
1,750,000 |
- |
Prudential Borrowing |
b) The capital programme monitoring position as at end of June 2009, including forecast outturns and slippage into 2010-11, as set out at Annex C and D.
c) The funding arrangements for the 2009-10 capital programme as set out at Annex E.
(4) The usage of section 106 funds as outlined in paragraph 2.1 additions to the capital programme.
· GF060 Places of Change
· HRA016 Woodside Way
(5) That a future report to set out progress towards the Council’s carbon management programme.
Supporting documents:
-
14D Capital Monitoring Report, item 14d
PDF 208 KB
-
14D Capital Report zAnnex A, item 14d
PDF 220 KB
-
14D Capital Report zAnnex B, item 14d
PDF 159 KB
-
14D Capital Report zAnnex C, item 14d
PDF 49 KB
-
14D Capital Report zAnnex D, item 14d
PDF 30 KB
-
14D Capital Report zAnnex E, item 14d
PDF 28 KB
Follow us on…